Architectural design contracts are not construction contracts or for goods made to consumer specifications.
(Reference for a preliminary ruling ā Consumer protection ā Consumer rights ā Directive 2011/83/EU ā Scope ā Article 3(3)(f) ā Concept of ācontracts for the construction of new buildingsā ā Article 16(c) ā Concept of āgoods made to the consumerās specifications or clearly personalisedā ā Contract between an architect and a consumer for the drawing-up of a plan for a new single-family house)
Rechtsvraag
Whether a contract between an architect and a consumer for the design and planning of a new single-family house falls under the exceptions in Directive 2011/83/EU, specifically as a 'contract for the construction of new buildings' or as a contract for 'goods made to the consumerās specifications or clearly personalised'.
Regel
- Art. 3(3)(f), Directive 2011/83/EU (Excludes contracts for the construction of new buildings from the directive's scope)
- Art. 16(c), Directive 2011/83/EU (Excludes contracts for the supply of goods made to the consumerās specifications or clearly personalised from the right of withdrawal)
- Art. 2(3) and (4), Directive 2011/83/EU (Defines 'goods' and 'goods made to the consumerās specifications')
Conclusie
The Court concluded that the contract between the architect and the consumer does not fall under the exclusions for contracts related to the construction of new buildings or for goods made to the consumer's specifications, as outlined in Directive 2011/83/EU. Therefore, it is subject to the consumer protection provisions of the directive, including the right of withdrawal.
Tijdlijn
- 25-10-2011 Directive 2011/83/EU on consumer rights is adopted by the European Parliament and Council.
- 22-12-2016 MS and AS, consumers, concluded a contract with NK, an architect, for the design of a new single-family house.
- 02-02-2017 NK sent the construction plan, an approximate cost summary, and an invoice for EUR 3780 to MS and AS.
- 12-02-2017 MS and AS expressed dissatisfaction with the service and withdrew from the contract with NK.
- 12-06-2018 The Bezirksgericht Graz-Ost dismissed NK's application for payment, finding that the contract was within the scope of FAGG but MS and AS had no liability due to lack of information.
- 05-02-2019 The Landesgericht für Zivilrechtssachen Graz made a request for a preliminary ruling to the Court of Justice of the European Union.
- 04-03-2019 The Court of Justice of the European Union received the request for a preliminary ruling.
- 14-05-2020 The Court of Justice of the European Union delivered its judgment regarding the interpretation of Directive 2011/83/EU.